I - 196 Business Loop (BL) Crossing Study

Click Below to View the Full Study!

Quick Facts

  • The MACC chose the consulting firm CDM Smith to develop the document and guide the study

  • The study limits are from 120th/Waverly Road to 88th/Fairview Avenue

  • MDOT will be doing road maintenance on this stretch in 2024

  • MDOT has agreed to do existing crossing upgrades during the 2024 project

  • The study suggests two bridge locations. One primary and one Illustrative

  • Primary - In between 92nd Ave and 88th Ave

  • Illustrative - VanHill Drive through Consumer’s Energy right-of-way

  • The MACC is actively pursuing grants to make all these upgrades a reality